Construction of new interchanges at the Moscow Ring Road

• Construction of new interchanges at the Moscow Ring Road

Moscow is experiencing a new wave of reconstruction of interchanges. In the same time there are several objects. Yes, now the south is very difficult to drive. But there is hope that it will be then easier.

Let's look at this huge construction site from the air.

Construction of new interchanges at the Moscow Ring Road

Isolation is part of the "Big Leningradka" and at the same time one of the elements of the reconstruction of the Moscow Ring Road. In this area were constructed levorotatory trestle length of 1, 8 km in the direction of Ring-west direction and the right turn road Rublevskoe - length of 0, 3 km from the exit to Ring-east. It was also reconstructed: right turn exit to the inner side of the Ring Road, take the exit when driving from an area on the inner side of the ring road and a reversal by Congress of the Leningrad highway overpass.

Construction of new interchanges at the Moscow Ring Road

Movement opened in 2012.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

Reconstruction clover interchange at the intersection of the Moscow Ring Road Volgogradki began in March 2013 and was completed in just a year and a half. As a result of the reconstruction of interchange overpass received two left turn, right turn, and two congress congress. Reconstruction of affected existing conventions and side passages along the Ring Road. In total, this junction was built more 6, 5 km of roads.

Construction of new interchanges at the Moscow Ring Road

Movement at Junction opened Sept. 2, 2014.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

Reconstruction Businovskaya interchange is planned to be completed by the end of this year. Reconstruction Project includes construction of the main section of the road longer than 1 km and a width of 6 to 10 bars, the construction of two trestles and three overpasses, including over the railway Kastrychnitski direction CIT construction six directional conventions. Overpass, which along the Oktyabrskaya railway has connected Businovskaya interchange with the Festival street, has already been built. Work on a nearby overpass coming to an end. It will connect the Festival and Taldomskaya street over the railway line.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

Today is the second stage of reconstruction. Completion of the first stage was the opening movement of June 16 to the new overpass - left turn exit from the Dmitrov highway when driving in the center of the inner side of the Moscow Ring Road (MKAD-east). Simultaneously with the open trestle right turn with Dmitrovsky exit road from the center in the east direction Ring (two lanes). The total length of highways open to traffic areas of 1, 65 km. In the second stage of reconstruction will be built levorotatory tunnel from the center in the direction of Ring-west, combined with a transit tunnel for the motion from the center to the right side travel along the main directions Dmitrovsky highway. In addition, all will be reconstructed right turn congresses and built overclocking-brake band. In total, this interchange will be built over 10 km of roads.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

Reconstruction clover interchange at the intersection of Lenin Avenue and Ring Road, in the course of which will be constructed three flyovers and tunnel should be completed in September 2015. The main task of the designers was to separate the flow of cars moving along the Ring Road, from cars that need to move out on Leninsky Prospekt, or Kiev highway. There is a "clover leaf" can not cope with heavy traffic, because of what and there are traffic jams. The builders have to build a left turn for the overpass exit Leninsky Prospekt on the outer side of the Moscow Ring Road and two overpasses that will leave the highway Kiev on the inside and outside of the ring road. To make a left-hand turns from the inside of MKAD on the Kiev highway levorotatory Congress (tunnel) will be built. Along the outer side is constructed Ring lateral passage (doubler ring), transitional-speed band will be made in the junction congresses and local passages. Who is to make the area of ​​the work of the car, the traffic started up on the new Congress to Moscow on Leninsky Prospekt in the center.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

At junction build five platforms with a total length of 1, 5 km. After completion of the construction will be less congestion on Lake Street and Bohr highway will improve road situation in the 48-th kilometer of the Moscow Ring Road. Today it is open to traffic on the overpass left turn to exit the Michurinsk prospectus via Lake Street on the outer side of the Moscow Ring Road and two viaducts over the Ring Road, which allowed to restart the movement of vehicles at the time of reconstruction. And in October, open to traffic and the new left turn overpass with highway Borowski on the inner side of the Moscow Ring Road. The reconstruction project also envisages the construction of two directional left turn Congresses - from Lake Street to the outer side of the Moscow Ring Road and highway Borowski on the inner side of the Moscow Ring Road. Construction of acceleration and deceleration lanes and side passages along the Ring Road and Borowski highway, reconstruction of the existing left and right turn Congresses. Total build about 11 kilometers of roads.

Construction of new interchanges at the Moscow Ring Road

to shut down at the interchange is planned before the end of the year.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

Reconstruction Mozhaiskogo highway is scheduled for completion before the end of this year. At the site of one of the main problems is the arrangement of lanes for public transport. Their total length in both directions will be more than 25 km. Construction work also imply Mozhajskij overpass movement which opened in August. Thanks to the work carried out was able to solve several important tasks: to organize a dedicated lanes for public transport on Kutuzov Avenue; construct third main path small rings Moscow railway (MC MOR) - transport interchange node (TPU) will be placed in the area; replace the main load-bearing structures of the overpass. In mid-September it was launched traffic on Europe's longest pier on the Mozhaisk highway from the streets Tolbukhin to Peter Alexeyev Street. Also, due to the federal budget Mozhayskoe extend beyond the Moscow Ring Road (highway M-1 "Belarus").

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

Clover interchange at the intersection of Ring Road and Kashira Highway will receive a four overpasses and one underpass. Two left turn flyover, length 612 and 665 meters, will provide Congress with the Kashira highway on the inner side of Ring Road while driving from the area, and on the outer side - when driving from the center. Another rack, length 164, 8 meters, designed to Congress on the outside of the Moscow Ring Road on Kashirskoye highway to Moscow. Fourth overpass, length 368, 9 meters, will provide transportation turn, moving from the Warsaw highway ring road. The tunnel to be built along the inner side of the Moscow Ring Road on the side road. For convenience and security of citizens in the area towards the Warsaw highway is designed pedestrian crossing the ring road. In addition, it is planned to reconstruct the Moscow Ring Road in the area of ​​2, 14 km long and Kashirskoye - on a plot of 0, 46 km. Along beltway appear lateral passages length of 1, 28 km.

Construction of new interchanges at the Moscow Ring Road

The construction is scheduled for completion in autumn 2015.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

The project involves the reconstruction of the Ryazan and Lermontov Prospekt, construction and reconstruction of the transport interchange congresses, side passages, as well as construction sites for the inspection of vehicles and turns. In addition, the planned construction of two overpasses and tunnels. In the shopping center "Scarab" area pedestrian bridge will appear. The total length of roads that will undergo reconstruction - more than 6 km.

Construction of new interchanges at the Moscow Ring Road

As a result of the reconstruction of the existing two-tier road interchange will be upgraded to a four-full-circle.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road

The construction of the transport interchange at the intersection of the Moscow Ring Road to Volokolamsk highway enters Volokolamke renovation project. Needless highway will be widened to five lanes in both directions, near the metro station "Tushinskaya" flyover will be built with access to the new stadium "Spartak". Along the overpass will be built side passages on three lanes in each direction. Under the overpass at the intersection of Volokolamsk Volokolamsk highway with passing vehicles provided rotations in all directions and a turn in the direction of Moscow, and at the intersection of Volokolamsk highway with projected travel - left turn to the future transport interchange node and the stadium "Spartak".

Construction of new interchanges at the Moscow Ring Road

To date, work began on the reconstruction of the Volokolamsk Highway.

Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road Construction of new interchanges at the Moscow Ring Road